Wilmington Fire Station No. 6 | Riverlights

Back to Practice Area
a fire truck parked in front of a building
an aerial view of a large blue house
the front of a building with a clock tower
a building with a metal roof and a clock tower
a large room with couches and a flat screen tv
a large kitchen with blue cabinets and a skylight
a long hallway with lots of windows in it
a gym with a row of exercise machines
a gym with a blue wall and white floors
a room with tables, chairs, and a flat screen tv
a room with blue walls and wooden floors
a bedroom with two beds and a desk

Becker Morgan Group supplied architectural, planning, design and construction services for this three-bay drive through fire station. An 8-12 member crew serves a rapidly growing residential community on the Cape Fear River. Spaces include a lounge, dine-in kitchen, and fitness/training rooms on an elevated, wooded site. Designing the new station on an undeveloped site required imagining the future neighborhood – aesthetics, scale, traffic – and coordinating with neighborhood development guidelines and review committees. Project is designed to LEED standards and was completed in 2025.

 

Highlights

  • Client: City of Wilmington Fire Department
  • Size: 12,570 SF
  • Completion Date: 2025