Roland Grise Middle School

Back to Practice Area
a large building with many windows on the side of it
a classroom with yellow chairs and desks
a library filled with lots of blue chairs and tables
a hallway with a welcome sign on the door
a library with tables, chairs, and bookshelves
a large building with lots of windows on the side of it
a library with tables, chairs, and a television
a classroom with desks, chairs, and computers
a library filled with lots of blue chairs and tables
an empty classroom with desks and chairs

This project encompassed the design of major renovations to the existing buildings (A-D) with limited demolition and reconfiguration of spaces to address the building systems (energy performance) and infrastructure needs to create an appropriate learning environment. 44,772 sf (Buildings A+D) and 25,920 sf (Modulars). Modifications to the campus included site improvements for improved vehicular and pedestrian safety. The project was scaled back to focus on the primary academic building (A), the main administrative office (D), and the site for a more comprehensive renovation. Design included the construction of 8 large modular classroom buildings for 32 classes to allow 864 students to relocate fully during the renovation. To maintain occupancy of the other buildings throughout construction, the project was completed in 3 phases. Energy conservation measures include a building automation system, LED lighting, daylight-sensitive occupancy sensors, and insulated curtainwall glazing. Life safety was enhanced by adding a fire suppression system, fire alarm, hurricane-rated curtainwalls and storefronts, and seismic improvements to masonry walls.

Highlights

  • Client: New Hanover County Schools
  • Size: 70,693 SF
  • Completion Date: August 2019
  • Project Type: Addition & Renovation